Finding it very difficult to obtain quotes and costings, even with engineer's certified plans. Quotes so far have been nearly twice the amount we expected, and we have had to ask for costings. At this time it looks like we may have to do the job in stages. :-(
I was hoping to avoid doing that because of the added cost and inconvenience of moving stuff in and out of the house. Also I have torn a ligament in both my calves, which slows me down somewhat. I am growing a mo' for Movember.